Objectives

Thekweni Reinforcing is focused on delivering products used in the civil and building and construction process but has expanded to supplying the mining and certain steel fabricators businesses.

Where To Start?

“ The process of Rib & Block is as simple as the product itself ”

Thekwani understands that you as our client do not always know how to get the process started and that is why we are here to facilitate the entire Rib & Block process for you.

  1. Customer to supply Thekwani with the Engineer ’s design/schedule for Rib & Block. (Customers who do not have an Engineer yet, can send their architectural Drawings in order for us to obtain a free analysis from an Engineer for quoting purposes. The quote will include Engineering fees as well as a minimum of two Site Visits by him. Quoting lead time will depend on the Engineer’s response time).
  2. Once all the necessary information has been obtained, we will provide you with a quote that will be valid for 7 days.
  3. Due to the fact that rib and block are made to order only, a deposit of 50% of the total value of the quotation is payable before any manufacturing will commence.
  4. Once the manufacturing process is done, the date of delivery will be communicated to the customer. The balance payment is due at least 3 days prior to the delivery of finished goods

Benefits Of Rib & Block

1. Cost-Effective

  • Concrete use is reduced by about 30 to 40% compared to conventional insitu slab systems
  • No Crane required for installation
  • Less Labour required
  • Fewer props required and props can be removed sooner compared to cast-in-situ slabs and thus saving in props rental costs
  • The system is simple to use and does not require costly skilled labour.

2. Time-Saving

  • The system ensures faster cycles than formwork / insitu decks and thus saves time
  • Saves time as it is not effected by weather conditions and is made while the supporting walls are being constructed on-site
  • The substitution of concrete blocks with polystyrene blocks will ensure further time saving and costs savings.

3. Other Benefits

  • Allows you to build on steep sites without crane requirements, therefore utilizing previously wasted space and cost-effective
  • Suitable for applications in all types of buildings
  • Well known and proven product favoured by many Engineers.

Get in touch.

How To Order

Orders can be processed either telephonically or by email. In certain areas where these systems are not appropriate, orders are placed and delivered manually.